PERMIT FEES WILL BE DOUBLED IF WORK IS STARTED WITHOUT FIRST OBTAINING A PERMIT
| Rezoning | $ 200 |
| Variance | $ 100 |
| Special use/exception | $ 100 |
| Conditional use | $ 100 |
| Subdivision plat | $ 100 plus $5 per/lot |
| Site plan | $ 100 |
| Planned residential and development | $ 250 plus $20/dwelling |
| RESIDENTIAL: | |
| New construction | $ 50 plus $.10 per sq. ft. |
| Remodeling requiring structural, electrical or plumbing changes | $ .10 per sq ft w/ $50 minimum |
| Remodeling (over $500) not requiring structural, electrical or plumbing changes | $25 |
| COMMERCIAL | |
| Public Building - New construction: | $ 200 +.10 per sq ft |
| New Construction: Church, temple, fraternal | $ 200 +.10 per sq ft |
| Foundation Only | $ 25 |
| Remodel w/Inspection: | $ .05 per sq ft w/ $100 minimum |
| Remodel w/no Inspection | $ 50 |
| OTHER: | |
| Sign | $ 50 per sign |
| Demolition | $ 50 |
| Certificate of Occupancy | $ 50 |
| Moving | $ .10 per sq ft. |
| Mobile Home Park | $ 100 + $5 per ph space |
PERMIT FEES WILL BE DOUBLED IF WORK IS STARTED WITHOUT FIRST OBTAINING A PERMIT